What Should Be Included in a Custom Cabinet Quotation?

Before confirming a custom cabinet project, homeowners should understand what is included in the quotation and which items may require additional charges.

A quotation should clearly show the cabinet scope, installation work and any separately charged items before the project is confirmed.
 

Quick Answer


Cabinetku’s quotation includes design consultation, site measurement, cabinet carcass and doors, standard soft-close hardware, delivery and installation.

An RM300 site visit fee applies for professional site measurement. The fee is fully deductible when the project is confirmed.

Countertops, electrical work, plumbing work, hacking, dismantling and disposal, hood ducting and premium hardware upgrades are charged separately.


What Is Included in Cabinetku’s Quotation?

The following items are included in the cabinet project quotation:


• Design consultation

• Site measurement

• Cabinet carcass and doors

• Standard soft-close hardware

• Delivery

• Installation


These items form the main scope of Cabinetku’s custom cabinet service.


Design Consultation

The design consultation allows the customer’s cabinet requirements to be discussed before the project proceeds.

The preliminary quotation is prepared based on the requirements discussed during the consultation.


Cabinet Carcass and Doors

The cabinet quotation includes the cabinet carcass and cabinet doors according to the confirmed project requirements.


Standard Soft-Close Hardware

Standard soft-close hardware is included in the cabinet quotation.

Premium hardware upgrades are not included under the standard hardware package and will be quoted separately.


Delivery and Installation

Cabinet delivery and installation are included in the quotation.

Stating the installation scope clearly allows customers to understand that the quoted cabinet price covers more than cabinet production alone.


Which Items Are Charged Separately?

The following items are normally charged separately from the cabinet quotation:

• Countertops

• Electrical work

• Plumbing work

• Hacking

• Dismantling and disposal

• Hood ducting

• Premium hardware upgrades


These items are separated because their final cost depends on the specific requirements and scope of the project.


Countertop

The countertop is charged separately from the cabinet quotation.

Quartz stone countertops are available from RM200 per foot run, depending on the selected specifications and project requirements.


Electrical and Plumbing Work

Electrical and plumbing work are not included in the standard cabinet quotation.

Any required electrical or plumbing work will be calculated separately according to the project scope.


Hacking, Dismantling and Disposal

Hacking, dismantling existing cabinets and disposal work are charged separately.

These charges will depend on the existing site condition and the amount of work required.


Hood Ducting

Hood ducting is not included in the standard cabinet quotation and will be quoted separately when required.


Premium Hardware Upgrades

Standard soft-close hardware is included.

Customers who select premium hardware upgrades will receive a separate quotation based on the selected hardware.


Is There a Site Measurement Fee?

Yes. An RM300 site visit fee applies for professional site measurement.

The site visit is conducted after the preliminary quotation has been prepared based on the showroom consultation.


Is the RM300 Site Visit Fee Deductible?

Yes. The RM300 site visit fee is fully deductible when the customer confirms the project with Cabinetku.

This means the fee is deducted from the confirmed project amount.


Cabinetku’s Quotation Process

The quotation and site measurement process follows this sequence:

• Showroom consultation

• Preliminary quotation

• RM300 site visit

• Project confirmation


The professional site measurement allows the project requirements and actual site conditions to be reviewed before the project proceeds.


Important Quotation Note

Cabinetku’s quotation includes design consultation, site measurement, cabinet carcass and doors, standard soft-close hardware, delivery and installation.

Countertops, electrical work, plumbing work, hacking, dismantling and disposal, hood ducting and premium hardware upgrades are charged separately.

The RM300 site visit fee is fully deductible upon project confirmation.

Jul 20,2026