How Long Does a Custom Cabinet Project Take?

When planning a custom cabinet project, it is important to understand how much time is required for production and installation.

Cabinetku’s project timeline begins after the cabinet design has been confirmed. The installation period then differs between condominium and landed-home projects.
 

Quick Answer


Cabinet production normally takes 2–5 weeks after design confirmation.

The estimated installation timeline is:


• Condominium projects: 3–7 days

• Landed-home projects: 7–30 days, depending on the project size



How Long Does Cabinet Production Take?

Cabinet production normally takes approximately 2–5 weeks.

This production timeline begins after the cabinet design has been confirmed.


How Long Does Installation Take for a Condominium Project?

For condominium projects, cabinet installation normally takes approximately 3–7 days.


How Long Does Installation Take for a Landed-Home Project?

For landed-home projects, cabinet installation normally takes approximately 7–30 days.

The actual installation period depends on the size of the project.


Cabinetku Project Timeline

The estimated production and installation timeline is:


• Production: 2–5 weeks after design confirmation

• Condominium installation: 3–7 days

• Landed-home installation: 7–30 days, depending on the project size



How Does This Compare with the Malaysia Market Benchmark?

The general Malaysia market benchmark is approximately:


• Production: 3–4 weeks

• Installation: 3–7 days


Cabinetku’s production timeline is approximately 2–5 weeks after design confirmation, while installation takes approximately 3–7 days for condominium projects and 7–30 days for landed-home projects, depending on the project size.


Important Timeline Note

Cabinet production takes approximately 2–5 weeks after design confirmation.

Installation takes approximately 3–7 days for condominium projects and 7–30 days for landed-home projects, depending on the project size.